joeyfjj SG HCLR changed plugin again - this time, the plugin from the Chashinai Railways's 9000 Series train will be used, and as an result the trains can run in full ATO. ATC and TASC has been installed throughout the network. ATS-P and -SN will not be available as a backup system.More information: http://odakyufan.uuuq.com/chashinai/train-9000.html
joeyfjj SG Lol looks like NEL/CCLI based it on videos of the CCL's tunnel view. If anyone wants them, drop me a message!
joeyfjj SG 4/4 2011That's four quarter lah.Anyway, depot in better shape, 10 tracks, with the train entering the last; Metropolitan South also in a better shape and will be the template for all other stations; the ATC commands removed and will be re-coded.
joeyfjj SG U want the stop sign I got, set-back limit i dont have.Don't mind can send me via WLM, I'll see - already have the LU style ones, but not implemented yet. .
joeyfjj SG Here's another peek into the development...[openBVE] Harbourvale City Light Rail: Monument Depot Level Crossing A work-in-progress of one of my projects. In this video you will see the level crossing located just before Monument Depot. Seen on the right is the maintainance shed of the depot, and what is unseen are the stabling roads.
SBS7373D SG do this route have a pre release? like the north west line like that? can i be the tester of this route and give feedback?Mod Note: Edited spelling